The LG-02 Darussalam distribution network, within the operational area of PT. PLN (Persero) ULP Lhokseumawe City, shows low voltage issues at the Gg. Damai and Bakso Pakde substations. According to PT. PLN standards, transformers face adverse loading conditions if usage exceeds 80% capacity. Specifically, Gg. Damai operates at 88.5% capacity and Bakso Pakde at 94.4%, resulting in a voltage drop of 370 Volts from the nominal 400 Volts at end consumer service phases. SPLN T6.001-2013 recommends that voltage differences at supply terminals not exceed ±10% of the system's nominal voltage, allowing a maximum drop of 360 Volts between phases under normal conditions. Failure to address these issues promptly risks further significant voltage drops. To resolve voltage drop and power loss problems, this study proposes a network repair plan using ETAP 19.0.1 software to align consumer-side voltage and transformer loading with PLN standards. Repair measures include installing additional transformers in the low-voltage distribution network. Post-repair assessments indicate a voltage drop reduction of +2.5% or an increase of approximately 10 Volts at both substations.

Article Details

How to Cite
Analysis of Voltage Drop Improvement Using Transformer Insertion Method in LG-02 Receiver Lhokseumawe City. (2024). Applied Engineering, Innovation, and Technology, 1(1), 47-58. https://doi.org/10.62777/aeit.v1i1.19
Section
Articles

How to Cite

Analysis of Voltage Drop Improvement Using Transformer Insertion Method in LG-02 Receiver Lhokseumawe City. (2024). Applied Engineering, Innovation, and Technology, 1(1), 47-58. https://doi.org/10.62777/aeit.v1i1.19

References

F. S. Lukman, A. Hasibuan, A. Setiawan, and M. Daud, “Performance Of 25 KWP Rooftop Solar PV At Misbahul Ulum Building, Lhokseumawe City,” in 2020 4rd International Conference on Electrical, Telecommunication and Computer Engineering (ELTICOM), IEEE, Sep. 2020, pp. 81–86.

E. Giroth, “Analisis Pengaruh Beban Lebih Terhadap Penurunan Kapasitas Transformator Daya 70 Kv di Gardu Induk Likupang,” Universitas Sam Ratulangi, 2023.

Raka Trialviano Bagus and D. Irawan, “Analisis Perbaikan Jatuh Tegangan Pada Sistem Transmisi 150kV Gardu Induk Cerme Menggunakan Aplikasi Digsilent,” Jurnal Ampere, vol. 8, no. 1, pp. 10–21, 2023.

D. Saing, “Evaluasi Kehandalan Jaringan Listrik 20 Kv Berdasarkan Nilai Saidi-Saifi Terhadap Pemasangan Tabung Urgent Cut Out di PLN (Persero) ULP Medan Baru,” Universitas Pembangunan Panca Budi, Medan, 2021.

R. A. Putra, “Analisis Rugi - Rugi Daya Distribusi Primer 20 kV Di Kota Ternate,” Universitas Sam Ratulangi, 2020.

M. H. S. Sahidanto, B. Wafiq, H. A. Zain, F. A. Nurulita, and T. E. Putri, “Analisis Metode Sisip Trafo Satu Fasa dan Rekonfigurasi Jaringan dalam Mengatasi Trafo Overload pada Gardu SCG08-0066 PT PLN (Persero) ULP Magelang Kota,” Jurnal Listrik, Instrumentasi, dan Elektronika Terapan, vol. 4, no. 2, 2023.

R. Dwijayanti and S. I. Haryudo, “Prediksi Pembebanan Penyulang Transformator Distribusi Gardu Induk Petrokimia dengan Metode Nonlinear Autoregressive Neural Network (NARNN) ,” Jurnal Teknik Elektro, vol. 8, no. 1, pp. 57–62, 2019.

D. Makmur, “Simulasi Optimasi Penempatan Kapasitor Bank untuk Perbaikan Drop Tegangan pada Feeder Bumiayu 07 dengan ETAP,” Universitas Islam Sultan Agung, Semarang, 2022.

H. A. Siahaan, “Analisis Susut Energi Untuk Tindakan Pemeliharaan Jaringan Tegangan Menengah Di Pt Pln (Persero) Ulp Siborongborong,” Universitas HKBP Nommensen, 2022.

P. S. Sinaga, “Perbandingan Pendapatan Listrik Prabayar dan Listrik Pascabayar pada PT. PLN (Persero) Unit Induk Distribusi Lampung Periode 2021-2022,” Universitas Lampung, Bandar Lampung , 2023.

Y. N. Muhammad, I. Darmawan, T. Andriani, and M. Hidayatullah, “Perbaikan Tegangan Penyulang Karumbu dengan Metode Pecah Beban pada PT. PLN (Persero) ULP Woha,” Journal Altron; Journal of Electronics, Science & Energy systems, vol. 2, no. 02, pp. 155–164, 2023.

A. A. N. O. A. Wijaya, “Upaya Pemerataan Beban Antara Gardu Distribusi KA 0064 Dan Gardu Sisip KS 0038 Di Penyulang Matsuka Dalam Mengatasi Overblast,” Politeknik Negeri Bali, 2022.

Denny Haryanto Sinaga, Riz Rifai Oktavianus Sasue, and Harvei Desmon Hutahaean, “Pemanfaatan Energi Terbarukan Dengan Menerapkan Smart Grid Sebagai Jaringan Listrik Masa Depan,” Journal Zetroem, vol. 3, no. 1, pp. 11–17, 2021.

A. P. Putra Purnomo, I. A. Dwi Giriantari, and I. N. Satya Kumara, “Studi Pengurangan Emisi Karbon Sistem Ketenagalistrikan Provinsi Bali: Analisis RUPTL 2021-2030,” Jurnal SPEKTRUM, vol. 10, no. 3, p. 1, 2023.

M. Syakirman, A. Bintoro, and A. Hasibuan, “Simulasi Perbaikan Tegangan dengan Pemasangan Turbin Angin pada Sistem Distribusi Radial Kota Lhokseumawe Menggunakan ETAP,” Jurnal Energi Elektrik, vol. 7, no. 2, pp. 1–5, 2018.

J. J. H. Marbun, Yusniati, and R. Nasution, “Analisa Perbaikan Rugi-Rugi Daya Pada Jaringan Tegangan 380 Volt Dengan Pemerataan Beban,” Journal of Electrical Technology, vol. 4, no. 3, pp. 150–157, 2019.

D. Dasman and H. Handayani, “Evaluasi Keandalan Sistem Distribusi 20 kV Menggunakan Metode SAIDI dan SAIFI di PT. PLN (Persero) Rayon Lubuk Alung Tahun 2015,” Jurnal Teknik Elektro ITP, vol. 6, no. 2, pp. 170–179, 2017.