[1]
“Load Flow Analysis of 132 kV Transmission Line with Optimally Terminated Service Potential Transformer Substations”, PEC, vol. 2, no. 1, pp. 1–13, Apr. 2025, doi: 10.62777/pec.v2i1.36.