[1]
“Economic Load Dispatch on a 132 kV Line with Service Potential Transformer Substations: A Case Study of Juja-Rabai Line”., PEC, vol. 1, no. 2, pp. 81–91, Sep. 2024, doi: 10.62777/pec.v1i2.26.