“Economic Load Dispatch on a 132 kV Line with Service Potential Transformer Substations: A Case Study of Juja-Rabai Line”. (2024) Journal of Power, Energy, and Control, 1(2), pp. 81–91. doi:10.62777/pec.v1i2.26.