[1]
2024. Economic Load Dispatch on a 132 kV Line with Service Potential Transformer Substations: A Case Study of Juja-Rabai Line. Journal of Power, Energy, and Control. 1, 2 (Sep. 2024), 81–91. DOI:https://doi.org/10.62777/pec.v1i2.26.